Skip to content
Global Access Atlas
Public change log

What changed in policy—or in our evidence—and how the pathway changed

Entries distinguish a new external policy event from an Atlas research revision. The official source date and the date Atlas changed its content are always shown separately. The log starts on 6 August 2026; earlier dossier work forms the initial evidence baseline.

Logging since2026-08-06
Saved in this browser. No email alerts or account required.
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-24Atlas content updated2026-11-27

Hunan sets the 2027 dual-channel separate-payment application window

Why Atlas revised this pathway

The Hunan Provincial Healthcare Security Administration will accept applications for its 2027 dual-channel separate-payment list from 30 November at 09:00 to 3 December 2026 at 17:00, Beijing time. Eligible categories under the notice include originators and generics newly added to the national list through 2025 or 2026 negotiation and absent from Hunan’s 2026 list, as well as drugs already in the provincial list. For a new application where a product with the same generic name is already on Hunan’s 2026 list, the price before charity discounts must be lower than the lowest listed payment standard after charity adjustment. Provincial inclusion will follow a later decision.

Change in the Atlas pathway

Confirm the product’s Hunan list status, applicable comparator and supporting material before applying.

Affected access gates
Implementation
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-27Atlas content updated2026-11-27

Beijing sets local platform listing deadlines for drugs in the 2026 lists

Why Atlas revised this pathway

The Beijing Municipal Pharmaceutical Centralized Procurement Service Center directs companies to list the specified negotiated, competitively bid and commercial-insurance innovative medicines still absent from the city platform via its green channel before 25 December 2026. Companies must proactively lower already-listed prices as required. The Beijing platform will remove products with noncompliant listed prices from 1 January 2027, and its ordinary process remains available for applications to restore listing.

Change in the Atlas pathway

Apply the Beijing-specific dates and price requirements to Beijing platform listings.

Affected access gates
Implementation
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-25Atlas content updated2026-11-27

Mainland China publishes guidance on rapid clinical-trial safety reporting

Why Atlas revised this pathway

The official pharmaceutical information portal published the full CDE Notice No. 55 and its technical guideline on 25 November. The guideline sets out sponsor procedures for collecting, evaluating and rapidly reporting suspected unexpected serious adverse reactions and other potential serious safety risks in registration-related trials. It supplements the current Good Clinical Practice framework as technical guidance.

Change in the Atlas pathway

Check sponsor safety procedures, reporting channels and applicable timing for each trial.

Affected access gates
Regulatory review
Atlas updated
Mainland China
Lifecycle accessAtlas research revision
Latest cited official source2026-11-27Atlas content updated2026-11-27

Mainland China clarifies post-market review of traditional Chinese medicine injections

Why Atlas revised this pathway

The National Medical Products Administration’s official interpretation explains how marketing authorisation holders are to plan post-market research and submit the completed evaluation to the Center for Drug Evaluation. It calls for early consultation about study plans and existing evidence and for prioritising relevant injections on the national essential medicines or basic insurance lists. For long-unproduced products, it describes a favourable benefit–risk review before supply resumes.

Change in the Atlas pathway

Check the applicable product cohort and the product-specific regulatory decision before changing supply plans.

Affected access gates
Lifecycle
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-24Atlas content updated2026-11-27

Anhui implements national round 12 procurement from 26 November

Why Atlas revised this pathway

The Anhui Pharmaceutical Pricing and Centralized Procurement Center set 26 November 2026 as the province-wide implementation date for national round 12 selected medicines. Anhui opened the corresponding provincial procurement project. The online authorization and purchase-contract window runs from 25 November to 2 December 2026. Selected companies must arrange distribution and institutions must prioritize selected products and contracted volumes.

Change in the Atlas pathway

Match the selected medicine, package and supplier to the Anhui procurement list and local contract.

Affected access gates
Implementation
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-23Atlas content updated2026-11-27

Mainland China issues its sixth list of pediatric medicines for development

Why Atlas revised this pathway

The sixth list was made public on 23 November. It identifies pediatric medicines, dosage forms and strengths for encouraged development and application. The notice provides for research support and priority review of relevant products. Inclusion in the national essential medicines and basic insurance lists remains subject to the applicable procedures.

Change in the Atlas pathway

Check the exact listed presentation and track its approval and coverage steps.

Affected access gates
Regulatory review
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-25Atlas content updated2026-11-27

NHSA confirms provincial rollout of pharmacy service fee schedules

Why Atlas revised this pathway

On 25 November, the NHSA reported that all provinces had integrated and issued the pharmacy service fee items based on the February 2026 trial guideline. It covers four groups and ten items, including home pharmacy services and certain specialist preparations. Check local prices and implementation rules. Routine intravenous preparation is included in the injection or infusion service fee.

Change in the Atlas pathway

Check hospital pharmacy service fees and the local charging unit separately from the drug price and coverage.

Affected access gates
Pricing
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-26Atlas content updated2026-11-27

NHSA launches a medicine claims history service

Why Atlas revised this pathway

NHSA announced the medicine claims history service on 26 November. Members can view outpatient, inpatient and pharmacy purchase claims filed through designated providers and pharmacies, and may authorize the treating clinician to view their prior medication records. The feed is updated the following day from local insurance settlement systems.

Change in the Atlas pathway

Use the service to retrieve claims history. Confirm individual payment and eligibility under the applicable local rules.

Affected access gates
Implementation
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-14Atlas content updated2026-11-24

Mainland China publishes the 2026 basic and commercial drug lists

Why Atlas revised this pathway

The joint notice was signed on 13 November. The 2026 basic medical insurance drug list and commercial health insurance innovative drug list were published on 14 November and take effect on 1 January 2027. NHSA reports 107 additions to the basic list, including 51 Class 1 innovative medicines, and 28 medicines on the commercial list. Check the basic list for product, formulation and payment restrictions and check the applicable commercial policy for benefits. Four negotiated medicines removed after unsuccessful renewals may continue under the former payment standard through 30 June 2027.

Change in the Atlas pathway

Match the indication, benefit and effective date.

Affected access gates
Coverage and payment
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-21Atlas content updated2026-11-24

Mainland China opens monoclonal antibody procurement filings

Why Atlas revised this pathway

For the nationwide alliance procurement of specified monoclonal antibodies, eligible reference and biosimilar product holders can file company, product and capacity information via the national healthcare security service platform from 09:00 on 24 November to 18:00 on 27 November 2026, Beijing time. Timely qualifying filings determine the products institutions can select for demand reporting. A late product can still qualify for later bidding if it passes eligibility review. The purchasing requirements and awards are subject to subsequent notices.

Change in the Atlas pathway

Check the implementation schedule and local scope.

Affected access gates
Implementation
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-18Atlas content updated2026-11-24

Mainland China sets a 30 November deadline for reference-medicine pre-communication

Why Atlas revised this pathway

The NHSA pricing and procurement guidance centre announced the third 2026 round of expert review for reference-medicine pre-communication. Eligible companies may submit the required materials by email through 30 November 2026 under the trial procedure. This is an application opportunity within the pre-communication process.

Change in the Atlas pathway

Check the applicable price basis, product and effective date.

Affected access gates
Pricing
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-14Atlas content updated2026-11-24

Mainland China sets provincial listing and hospital milestones for the 2026 lists

Why Atlas revised this pathway

Provincial authorities are to guide companies to list newly added drugs on provincial procurement platforms by the end of December 2026. Listed prices for negotiated drugs may not exceed the applicable payment standard. Designated and contracted institutions should in principle hold pharmacy committee meetings by the end of February 2027. Provinces are to update dual-channel and separate-payment scopes alongside the basic list. Check the local platform, hospital and dispensing channel for implementation.

Change in the Atlas pathway

Check the implementation schedule and local scope.

Affected access gates
Implementation
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-03Atlas content updated2026-11-13

Round 12 procurement in Mainland China: Beijing and Jiangsu

Why Atlas revised this pathway

For products covered by round 12 of national volume-based procurement, Beijing switches selected purchase prices on 21 November 2026 and implements the results from 00:00 on 28 November. Jiangsu schedules online contracts for 20–24 November, switches prices on 26 November and implements the results from 00:00 on 1 December. Check the separate local notice and product scope for each other jurisdiction.

Change in the Atlas pathway

Use the stated local implementation schedule and scope.

Affected access gates
Implementation
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-11-12Atlas content updated2026-11-13

Round 12 procurement in Mainland China: Fujian

Why Atlas revised this pathway

Fujian schedules platform listing for 27 November 2026, with sale prices and differentiated insurance payment arrangements from 4 December. These dates apply to products covered by Fujian’s notice for round 12 of national volume-based procurement.

Change in the Atlas pathway

Use the stated local implementation schedule and scope.

Affected access gates
Implementation
Atlas updated
Mainland China
Pathway changePolicy event incorporated
Official policy / event date2026-10-20Atlas content updated2026-10-24

2026 directory: agreement signing and implementation

Official policy change incorporated

The 20 October notice confirms that onsite negotiation, bidding and commercial-insurance price discussions took place in September and that results were confirmed onsite. Relevant companies can now download and sign agreements through the national platform. Signing is distinct from final directory publication, its stated commencement date, provincial settlement and actual stock. Neither this notice nor a planned publication month establishes those later events.

Change in the Atlas pathway

Signing is distinct from final directory publication, its stated commencement date, provincial settlement and actual stock. Neither this notice nor a planned publication month establishes those later events.

Affected access gates
2026 directory: agreement signing and implementation
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-24

Negotiation and payment scope form a combined decision

Why Atlas revised this pathway

The 17 April guidance clarifies reimbursement for label-consistent maintenance treatment by reference to dosage/administration, not only the indications section, subject to applicable directory and payment restrictions. For an approved combination, the latest approved label can establish the older components’ indication basis for reimbursement purposes; non-directory medicines and medicines with explicit payment restrictions remain excluded from this combination clarification. Other additions, removals or substitutions in a regimen do not receive blanket approval. The guidance retains existing local handling pending case-specific clarification; it defines payment boundaries, not clinical prescribing advice or guaranteed individual reimbursement.

Change in the Atlas pathway

Other additions, removals or substitutions in a regimen do not receive blanket approval. The guidance retains existing local handling pending case-specific clarification; it defines payment boundaries, not clinical prescribing advice or guaranteed individual reimbursement.

Affected access gates
Negotiation and payment scope form a combined decision
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-24

NMPA authorisation is separate from reimbursement access

Why Atlas revised this pathway

Boundary: an approved indication can establish eligibility for a directory-adjustment application. Changes to dosage or safety wording do not automatically qualify as a significant indication change under the 2026 application category. The actual 2026 GCP has six chapters and 54 articles. Participant protection, proportionate quality management, auditable responsibilities and data governance are supported by articles 4, 6, 9, 18–20, 29, 31–44 and 48–53. These general trial duties do not establish a medicine-specific approval or review timeline.

Change in the Atlas pathway

The actual 2026 GCP has six chapters and 54 articles. Participant protection, proportionate quality management, auditable responsibilities and data governance are supported by articles 4, 6, 9, 18–20, 29, 31–44 and 48–53. These general trial duties do not establish a medicine-specific approval or review timeline.

Affected access gates
NMPA authorisation is separate from reimbursement access
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-24

Comprehensive real-world reimbursement-value assessment

Why Atlas revised this pathway

The medicine-guidance notice of 14 January 2026 was a consultation, with comments due 30 January at 17:00. That historical status must not be generalised into a claim that no later rule exists. The March national pricing policy calls for evidence to inform directory and payment-standard adjustment. Apply the current instrument and actual product/task scope. Do not infer a fixed drug repricing formula, automatic loss of reimbursement or a drug requirement from a medical-service pricing pilot.

Change in the Atlas pathway

Apply the current instrument and actual product/task scope. Do not infer a fixed drug repricing formula, automatic loss of reimbursement or a drug requirement from a medical-service pricing pilot.

Affected access gates
Comprehensive real-world reimbursement-value assessment
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-18

NMPA authorisation is separate from reimbursement access

Why Atlas revised this pathway

Clinical-trial permission and GCP compliance do not themselves authorise marketing. Marketing approval issues a drug registration certificate with approved manufacturing, quality, label and product-information annexes. Under the regulations effective15May2026, certificates last five years: domestic holders seek re-registration from the provincial authority, overseas holders from the national authority. Fact: 2026 GCP prioritises participants' rights, safety and wellbeing. Quality by design, critical-to-quality factors and risk-proportionate quality management support reliable results and traceable data. Responsibilities of sponsors, investigators/institutions, ethics review, laboratories and contracted services must remain auditable throughout the trial. Effective-date boundary: the revised requirements apply from 1 September 2026, when Announcement No. 57 of 2020 is repealed. Record the announcement date of 21 May 2026, website publication on 8 June, commencement on 1 September and Atlas content update on 4 September separately. Fact: the statutory label defines approved indications, dosage/administration and safety information. Reimbursement must also meet the directory's restricted payment scope. Boundary: an approved indication can establish eligibility for a directory-adjustment application. Changes to dosage or safety wording do not automatically qualify as a significant indication change under the 2026 application category.

Change in the Atlas pathway

NMPA authorisation is separate from reimbursement access

Affected access gates
NMPA authorisation is separate from reimbursement access
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-18

Use final rules alongside clearly labelled draft history

Why Atlas revised this pathway

The 9 May interpretation concerns consultation drafts. Its publication-day eligibility wording and inclusive price-warning explanation must not override the final 31 May notice and attachments. Current pathway citations now use the final materials; the old interpretation remains explicitly labelled as draft history.

Change in the Atlas pathway

Use final rules alongside clearly labelled draft history

Affected access gates
Use final rules alongside clearly labelled draft history
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-18

Use the correct expense basis for renewal

Why Atlas revised this pathway

Since 2025, renewal ratios A and B use medicine expenses within the reimbursement scope, including the relevant insured-person costs at designated institutions and pharmacies. They do not use fund payments alone or all company sales. Actual expense data come from NHSA; budget data for 2024-onward new negotiations/renegotiations come from the signed result confirmation, while simplified-renewal budgets use that year’s platform declaration. For the 2026 expiring-agreement calculation, actual expenses combine full-year 2025 with January–April 2026 annualised by multiplying by three; the annual average is half that sum. Ratio A compares actual covered-scope expenses with the budget. Ratio B compares the added budget for an expanded scope with the higher of the original-scope budget and actual expenses. Non-expiring agreements have a separate one-year scope-expansion basis. Simplified renewal requires all eligibility conditions, including exclusivity, actual expenses no more than 200% of budget, reasonable future growth within the specified 100% limits, no major market change and no regular-directory transfer condition. For unchanged scope and fewer than four years, A bands up to 110%, 140%, 170% and 200% carry base reductions of 0, 5, 10 and 15 percentage points. Where A exceeds 110%, annual-expense bands may add 0, 2, 4, 6 or 10 points; a base band alone is not a final price prediction. Scope expansion applies the original-scope adjustment and then the additional-scope adjustment. The FAQ explains that the four-year concession halves the final combined reduction, rather than independently halving each component before compounding. Prior-year A reductions, expiry and product-category exceptions require separate checks; this overview does not calculate an individual renewal price.

Change in the Atlas pathway

Use the correct expense basis for renewal

Affected access gates
Use the correct expense basis for renewal
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-18

Check maturity and renegotiation branches

Why Atlas revised this pathway

Regular class B transfer covers non-exclusive medicines or negotiated medicines whose agreement expires in the adjustment year and whose continuous negotiated-list history reaches eight years. Eight calendar years alone do not cancel an unexpired agreement; the FAQ preserves complete two-year agreements signed earlier for new indications. For a qualifying eight-year exclusive medicine, compare the simplified-renewal reduction with a 10-point reduction when annual average covered-scope actual expenses exceed CNY300 million, and use the higher. A major market change instead leads to renegotiation before transfer. Government-priced medicines, volume-based procurement and non-exclusive medicines follow their distinct standard-setting rules. Eligible class 1 chemical, therapeutic-biological and traditional Chinese medicines may request renegotiation rather than the simplified route under the stated A conditions; the result is not guaranteed to be the formula price. Failure in that renewal branch can remove the medicine. Failure to agree a scope expansion has a different fallback: reconsider renewal/renegotiation for the original scope.

Change in the Atlas pathway

Check maturity and renegotiation branches

Affected access gates
Check maturity and renegotiation branches
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-18

Separate bidding standards from supply prices

Why Atlas revised this pathway

This non-exclusive directory-entry process excludes national volume-based procurement winners and government-priced medicines. At least one eligible offer must be no higher than the assessed payer willingness to pay. The lowest submitted offer sets the generic-name standard, subject to a floor of 70% of that willingness-to-pay amount; the floor does not raise the company’s own promised supply price. After successful bidding, participating firms commit to supply designated institutions and pharmacies nationwide at no more than their own bids. The formal rule flags generic-name platform prices strictly above 1.8 times the standard yellow and strictly above three times red, including non-participating firms. These are price warnings, not a new uniform supply price or an automatic exclusion. The bidding result lasts two years. After expiry, expert agreement ordinarily permits regular class B management; national VBP or government pricing can change the applicable standard separately. Prices below the standard are paid on the actual-price basis, while the amount above the standard is borne by the insured person, alongside the applicable local benefit rules.

Change in the Atlas pathway

Separate bidding standards from supply prices

Affected access gates
Separate bidding standards from supply prices
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-18

Keep filing stages and evidence materials distinct

Why Atlas revised this pathway

The 2026 initial filing window was 1 June at 09:00 to 10 June at 20:00. Provisional filing required technical review completed by 10 June and approval documents by 3 July; a medicine not pre-filed could not be added later. These are historical 2026 dates, not an open invitation or the 2027 cutoff. The guide’s initial application is online and free, using one continuing organisational account. It does not exempt later negotiation/price-discussion stages from their own material and paper-delivery instructions. Required summary slides must match the application and provide two versions, with economic/price information removed only from the second. The summary-slide limit is ten slides excluding the cover and contents, with a 50M file limit. Evidence should show comparative strengths and weaknesses; the FAQ prefers RCT results and authoritative guidelines. A blank comparator does not itself demonstrate high innovation or a high score, and final comparator feedback at expert review takes precedence over preliminary discussion.

Change in the Atlas pathway

Keep filing stages and evidence materials distinct

Affected access gates
Keep filing stages and evidence materials distinct
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-18

Follow scope and supply through implementation

Why Atlas revised this pathway

A medicine recommended for both basic and commercial-insurance pathways first enters basic-directory negotiation; only failure there proceeds to commercial price discussion. Commercial-directory inclusion is a reference for commercial insurance and mutual aid, not basic-insurance reimbursement or proof that a particular policy pays. A planned October–November publication stage is not an issued final directory. New indications and unlisted specifications need the prescribed adjustment process. The FAQ requires a written request for a missing specification under an already listed generic name, calculation from the negotiated main specification under differential-pricing rules, and agreement on the national standard. A new marketing authorisation or hospital stock record does not substitute for that process. Supply obligations include platform-listing applications, promoting stocking at designated institutions and pharmacies, and reporting implementation data. Unjustified deliberate non-supply can lead to removal and a temporary restriction on new directory applications. Monthly company-specific expense/fund feedback supports renewal data reconciliation; it is not independent proof of availability for every patient.

Change in the Atlas pathway

Follow scope and supply through implementation

Affected access gates
Follow scope and supply through implementation
Atlas updated
Mainland China
Lifecycle accessAtlas research revision
Latest cited official source2026-08-06Atlas content updated2026-10-17

Separate 2026 directory-stage eligibility from VBP implementation

Why Atlas revised this pathway

The 31 July notice states that a proposed negotiation, bidding or commercial-insurance price discussion grants participation eligibility, not final inclusion in either directory. Check the final directory and payment scope separately. The notice's confirmation and materials deadlines were 1 August at12:00 and10 August at17:00. These belong to that review round; later submissions or results must follow their own official notices. The 6 August twelfth-round VBP notice publishes selected results for implementation within2026, with each locality's notice determining the execution date. Do not treat6August as a single nationwide start date; match the selected pack, supplier and region to the formal lists. The31May formal notice used approval or completed technical review before10June for2026eligibility and announced that, from2027, the cutoff will be the work-plan publication date. Do not reuse the2026date as a2027filing rule.

Change in the Atlas pathway

Use the applicable statutory branch and date; confirm product-specific eligibility separately.

Affected access gates
Separate 2026 directory-stage eligibility from VBP implementation
Atlas updated
Mainland China
Pathway changePolicy event incorporated
Official policy / event date2026-05-21Atlas content updated2026-09-04

Mainland China: revised Good Clinical Practice becomes the clinical-evidence standard

Official policy change incorporated

NMPA Announcement No. 50 of 2026, dated 21 May and published 8 June 2026, brings the revised Good Clinical Practice standard into effect on 1 September 2026 and repeals the 2020 standard. It makes participant rights, safety and wellbeing paramount and requires quality by design, identification of critical quality factors, proportionate quality management, reliable and traceable data, fit-for-purpose computerized systems, and auditable duties across sponsors, investigators, institutions, ethics committees, laboratories and contracted service providers.

Change in the Atlas pathway

Atlas now treats current-GCP compliance as an upstream clinical-evidence and lifecycle gate before marketing authorization. The transition can affect trial initiation, conduct, change control, safety reporting, suspension or termination and the acceptability of the final authorization dossier; it does not itself create reimbursement. The official announcement date is 21 May 2026, publication date 8 June and effective date 1 September; the separate Atlas content-update date is 4 September 2026.

Affected access gates
Trial quality by design and critical quality factorsParticipant protection, ethics and safety reportingRisk-proportionate quality management and data traceability
Atlas updated
Mainland China
Pathway changeAtlas research revision
Latest cited official source2026-05-31Atlas content updated2026-08-06

Mainland China: Atlas separates the 2026 NRDL gates using existing official material

Why Atlas revised this pathway

No new official policy for Mainland China was published on 6 August. Atlas revised the pathway on that date after reviewing existing NHSA material on the 2026 catalogue cycle. The latest cited official source was published on 31 May 2026.

Change in the Atlas pathway

The Mainland China pathway now distinguishes formal NRDL submission, expert review, national negotiation or bidding, agreement-period management and later VBP/follow-on procurement instead of treating reimbursement as one listing event.

Affected access gates
NRDL submission and expert reviewNational negotiation or biddingRenewal, VBP and follow-on procurement