Skip to content
Global Access Atlas
Public change log

What changed in policy—or in our evidence—and how the pathway changed

Entries distinguish a new external policy event from an Atlas research revision. The official source date and the date Atlas changed its content are always shown separately. The log starts on 6 August 2026; earlier dossier work forms the initial evidence baseline.

Logging since2026-08-06
Saved in this browser. No email alerts or account required.
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-11-18Atlas content updated2026-11-27

Pharmac moves the second exceptional funding consultation to 2027

Why Atlas revised this pathway

The first consultation on the Exceptional Circumstances Framework is closed. On 18 November Pharmac moved the second consultation to 2027. The current framework, including NPPA, continues to apply while policy options are developed. Pharmac has not announced a final decision or implementation date.

Change in the Atlas pathway

For a current individual application, confirm the existing NPPA criteria and any medicine-specific conditions.

Affected access gates
Implementation
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-11-26Atlas content updated2026-11-27

Pharmac consults on simplifying hepatitis C treatment assessment

Why Atlas revised this pathway

The 26 November proposal would move Harvoni and ribavirin applications into existing Pharmac assessment and clinical advisory arrangements and retire the dedicated Hepatitis C Treatments Panel. If adopted, funded treatments, eligibility and how patients access treatment would stay the same. Submissions close on 10 December 2026 at 17:00 New Zealand time.

Change in the Atlas pathway

Check the latest official assessment and decision record.

Affected access gates
Evidence assessment
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-11-27Atlas content updated2026-11-27

Pharmac publishes provisional advice from the November PTAC meeting

Why Atlas revised this pathway

Pharmac published provisional recommendations on 27 November from the PTAC meeting held on 12 and 13 November. The combination of an SGLT-2 inhibitor and a GLP-1 receptor agonist received high priority for type 2 diabetes with high cardiovascular and renal risk, subject to Special Authority criteria. Treat the recommendation as advisory. Check the final minutes and Pharmaceutical Schedule separately for any funding decision.

Change in the Atlas pathway

Check the latest official assessment and decision record.

Affected access gates
Evidence assessment
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-11-24Atlas content updated2026-11-27

Pharmac funds two 50 mg fluconazole alternatives from 1 December

Why Atlas revised this pathway

The 24 November supply notice says that from 1 December 2026 Pharmac will fund Fluconazole (Sandoz) and APX Fluconazole 50 mg capsules as alternatives during the Mylan supply disruption. Pharmac expects the two brands to be orderable from early and late December respectively. Both are unreviewed by Medsafe and are subject to the Medicines Act section 29A arrangements identified in the notice.

Change in the Atlas pathway

Check the applicable product and implementation date.

Affected access gates
Implementation
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-11-23Atlas content updated2026-11-24

New Zealand publishes Pharmaceutical Schedule changes effective 1 December

Why Atlas revised this pathway

From 1 December 2026, Pharmac schedules changes to funded presentations and restrictions. The update includes a 4 mL Opdivo vial subject to specialist and Special Authority requirements and revised Special Authority criteria for letermovir tablets. A separate decision schedules injectable letermovir for hospital funding from the same date under its stated restrictions. Check the community or hospital Schedule section for the relevant presentation.

Change in the Atlas pathway

Match the indication, benefit and effective date.

Affected access gates
Coverage and payment
Atlas updated
New Zealand
Lifecycle accessAtlas research revision
Latest cited official source2026-11-19Atlas content updated2026-11-24

Pharmac consults on a replacement funded lithium brand

Why Atlas revised this pathway

With Douglas lithium carbonate 250 mg capsules being discontinued, Pharmac proposes funding Lithium Carbonate Essential Pharma 250 mg tablets and keeping the Douglas brand funded for a five-month transition. Consultation closes on 3 December 2026. A final decision is needed to establish the transition dates.

Change in the Atlas pathway

Check the product-specific obligations and timing.

Affected access gates
Lifecycle
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-11-04Atlas content updated2026-11-13

Pharmac 2026/27 medicines tender

Why Atlas revised this pathway

Pharmac issued the final community and hospital supply tender. Submit bids through the Electronic Portal by 16:00 New Zealand local time on 16 December 2026. Check the tender schedule for product scope and subsequent notices for awards and supply obligations.

Change in the Atlas pathway

Use the stated local implementation schedule and scope.

Affected access gates
Implementation
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-11-13

Paediatric oncology exceptional funding

Why Atlas revised this pathway

From 1 November 2026, Pharmaceutical Schedule rule 8.1(b) provides an exceptional funding route for eligible cancer treatment delivered by specialist paediatric oncology or haematology services at Health NZ hospitals. The previous arrangements for the two approved specialist services continue. Check the Pharmac policy for patient, service and notification requirements.

Change in the Atlas pathway

Verify eligibility, timing and payment for the specific setting.

Affected access gates
Coverage and payment
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Check full-approval eligibility and fee-based verification clocks

Why Atlas revised this pathway

Both recognised-authority initial full marketing authorisations must fall within four years before submission. Reliance-only approvals, including TGA COR, MHRA IRP and HSA abridged/verification, do not qualify as full evaluation. Joint work-sharing can qualify only with the required complete assessment-report sets. An initially provisional approval cannot be used merely because it later became full. The pathway also excludes cases requiring independent New Zealand benefit-risk assessment, including specified blood-derived, exclusively paediatric/pregnancy, gene-therapy and personalised products. The list is not exhaustive; seek advice for the precise product and risk-management requirements. Section 24(5) change applications referred to the Minister are not eligible for verification. Validation starts on payment of the validation fee and allows ten working days excluding missing-information stops. Evaluation Day0 is application-fee receipt; the Day20 RFI,30-day response and Day30 decision framework uses working days in New Zealand time, with the response clock stop. Acceptance and fees do not guarantee consent or Pharmac funding. Full marketing authorisation must not be pending deferral, or have been rejected or withdrawn, by any recognised authority for quality, safety or efficacy reasons. The medicine must not have faced regulatory action that may lead or has led to suspension or revocation of authorisation; two selected approvals do not override these tests.

Change in the Atlas pathway

Check full-approval eligibility and fee-based verification clocks

Affected access gates
Check full-approval eligibility and fee-based verification clocks
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Funding applications: one medicine may have separate applications for different indications

Why Atlas revised this pathway

Anyone may submit an ordinary Schedule funding application, including suppliers, clinicians and the public. Supplier proposals require rights to supply the product and the ability to contract with Pharmac; company applications generally include clinical evidence and a price proposal. Pharmac assesses the evidence and obtains independent clinical advice from PTAC or specialist advisory committees as needed, alongside research and economic analysis. A clinical recommendation helps the assessment but does not determine the final funding decision. Different indications for one molecule can have different application statuses, priority-list positions and access criteria. A single molecule-level funded/not-funded label is insufficient. Published provisional PTAC recommendations can precede the final committee-agreed record. Neither a provisional nor a final clinical recommendation is Pharmac’s confidential cross-portfolio ranking or a commitment to fund.

Change in the Atlas pathway

Funding applications: one medicine may have separate applications for different indications

Affected access gates
Funding applications: one medicine may have separate applications for different indications
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Portfolio agreements

Why Atlas revised this pathway

Purpose: combine several items from one supplier to improve budget and health outcomes. Mechanism: commercial terms may span products, and applications need not advance one by one in priority-list order. A product's public page may not disclose all cross-product terms. Commercially sensitive information must be identified with an explicit confidentiality request; withholding remains subject to the Official Information Act and other applicable law.

Change in the Atlas pathway

Portfolio agreements

Affected access gates
Portfolio agreements
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Check full-approval eligibility and fee-based verification clocks

Why Atlas revised this pathway

Both recognised-authority initial full marketing authorisations must fall within four years before submission. Reliance-only approvals, including TGA COR, MHRA IRP and HSA abridged/verification, do not qualify as full evaluation. Joint work-sharing can qualify only with the required complete assessment-report sets. An initially provisional approval cannot be used merely because it later became full. The pathway also excludes cases requiring independent New Zealand benefit-risk assessment, including specified blood-derived, exclusively paediatric/pregnancy, gene-therapy and personalised products. The list is not exhaustive; seek advice for the precise product and risk-management requirements. Section 24(5) change applications referred to the Minister are not eligible for verification. Validation starts on payment of the validation fee and allows ten working days excluding missing-information stops. Evaluation Day0 is application-fee receipt; the Day20 RFI,30-day response and Day30 decision framework uses working days in New Zealand time, with the response clock stop. Acceptance and fees do not guarantee consent or Pharmac funding.

Change in the Atlas pathway

Check full-approval eligibility and fee-based verification clocks

Affected access gates
Check full-approval eligibility and fee-based verification clocks
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Commercial terms: net expenditure, disclosure and supply obligations

Why Atlas revised this pathway

Pharmac generally needs acceptable commercial terms before it can support a funding decision. A listing agreement may specify the agreed price, rebates, access criteria and protection against delisting or subsidy reductions. It may also cover several products from the same supplier. A rebate can reduce the net unit price for all funded units or apply only to expenditure above a threshold. Discounts, two-part pricing and other expenditure-management mechanisms are also possible. The Schedule shows public subsidies and prices, which do not reveal net costs after confidential rebates. Confidentiality is subject to applicable disclosure law and the actual agreement: the published standard template expressly recognises Official Information Act and other legal disclosure obligations. A portfolio agreement may change the apparent acceptable price of an individual product. Comparison pages should identify this as a system-level commercial feature rather than imply a universal net-price formula. The published listing agreement is a template. Product, price, listing date and minimum stock belong in Annex1; negotiated special terms belong in Annex2 and prevail over inconsistent standard terms. It does not prove any particular supplier’s executed price, rebate, term or stock commitment. The standard template also requires supply continuity and applicable regulatory consents. A supply issue must be notified when the supplier becomes aware of it, with a report within two Business Days; alternative supply requires Pharmac’s written consent under the relevant clause. Read these as template contractual conditions, with the actual agreement and special terms controlling, rather than universal statutory deadlines.

Change in the Atlas pathway

Commercial terms: net expenditure, disclosure and supply obligations

Affected access gates
Commercial terms: net expenditure, disclosure and supply obligations
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Provisional agreement, consultation and final decision

Why Atlas revised this pathway

After a provisional agreement, Pharmac normally consults patients, whānau, Māori, clinicians, suppliers and Health NZ on the proposed population, access criteria, brand and implementation. Its April2026 policy requires formal consultation for first-time funding, proposed Schedule changes, material clinical or commercial impacts and other stated triggers. Consultation submissions may change the proposal. The Board or its delegate makes the final funding decision and Pharmac communicates the outcome under its policy. Only an approved Schedule change leads to the corresponding listing or amendment; a decision does not automatically create a funded listing. Reaching commercial agreement therefore does not yet create a final public commitment.

Change in the Atlas pathway

Provisional agreement, consultation and final decision

Affected access gates
Provisional agreement, consultation and final decision
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Hospital use: indication, prescriber and local execution checks

Why Atlas revised this pathway

The HML lists medicines that public hospitals may use or must fund under its rules. Some products have prescriber or indication restrictions. Hospitals may set additional local specialist restrictions, but must not unreasonably limit funded access or undermine Pharmac decisions and must notify Pharmac. Pharmac may require a restriction to be changed or removed. Hospital prescriber restrictions can be met through the specified specialist, documented specialist recommendation or an approved hospital protocol. Defined emergency arrangements require reasonable attempts to contact the specialist; treatment beyond 24 hours must satisfy the specialist or protocol route. A current Special Authority approval can satisfy an HML indication restriction, but does not by itself waive a prescriber restriction. Restricted-eligibility (RS) forms are local checklists and must not be submitted to Pharmac or the Ministry of Health. Check the actual hospital’s documentation requirements. An indication waiver is assessed case by case where the intent is met; this differs from satisfying the prescriber restriction. HML listing alone does not establish stock, service capacity or immediate patient supply. Unlisted medicines or uses outside an indication restriction normally require a specific Part8 exception, such as approved NPPA or a defined continuation arrangement; a broad statement of clinical need is insufficient.

Change in the Atlas pathway

Hospital use: indication, prescriber and local execution checks

Affected access gates
Hospital use: indication, prescriber and local execution checks
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Reference pricing changes funded listing, not marketing consent

Why Atlas revised this pathway

therapeutic subgroup decision; Pharmac; subsidy reduced/aligned; surcharge/switching possible; comparative therapeutic status; retained, switched or removed from funded listing

Change in the Atlas pathway

Reference pricing changes funded listing, not marketing consent

Affected access gates
Reference pricing changes funded listing, not marketing consent
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Portfolio negotiations concern products from the same supplier

Why Atlas revised this pathway

several products from one supplier considered together; Pharmac/supplier; cross-product economics; one/more applications may advance; portfolio terms and budget impact; bundled funding/variation

Change in the Atlas pathway

Portfolio negotiations concern products from the same supplier

Affected access gates
Portfolio negotiations concern products from the same supplier
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Rebate reconciliation follows the actual funding contract

Why Atlas revised this pathway

funded units or spend threshold; Pharmac/supplier; per-unit rebate or cap settlement; usually no automatic criteria change; contract sales/expenditure data; continuing/revised agreement

Change in the Atlas pathway

Rebate reconciliation follows the actual funding contract

Affected access gates
Rebate reconciliation follows the actual funding contract
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Hospital implementation has its own responsible provider

Why Atlas revised this pathway

national HML listing; Health NZ hospital; procurement/operational cost; stock/protocol/service readiness; comply with HML; local restriction notice; adopt, protocol, exception

Change in the Atlas pathway

Hospital implementation has its own responsible provider

Affected access gates
Hospital implementation has its own responsible provider
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Annual Tender: eligible items and funded supply terms

Why Atlas revised this pathway

competitive procurement for items eligible for the tender; Pharmac/suppliers; bid price/subsidy reduction; principal brand subject to item-specific share, contract, alternative-brand allowance and exceptions; stock, transition, supply performance; multi-year PSS/brand switch

Change in the Atlas pathway

Annual Tender: eligible items and funded supply terms

Affected access gates
Annual Tender: eligible items and funded supply terms
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Fixed-budget cross-portfolio prioritisation

Why Atlas revised this pathway

Purpose: compare marginal health outcomes across diseases and products and allocate a limited budget to the best overall combination. Mechanism: the Factors, HTA/cost-utility analysis, relative ranking and commercial/budget feasibility. Boundary: OFI is not funding approval. There is no public, fixed, automatic ICER cutoff.

Change in the Atlas pathway

Fixed-budget cross-portfolio prioritisation

Affected access gates
Fixed-budget cross-portfolio prioritisation
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Portfolio agreements

Why Atlas revised this pathway

Purpose: combine several items from one supplier to improve budget and health outcomes. Mechanism: commercial terms may span products, and applications need not advance one by one in priority-list order. Boundary: a public page for one product usually cannot fully explain cross-product considerations; commercial confidentiality should be explicit.

Change in the Atlas pathway

Portfolio agreements

Affected access gates
Portfolio agreements
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Special Authority and HML restrictions

Why Atlas revised this pathway

Purpose: target funded access to defined clinical circumstances, treatment sequences, specialists and care settings. Mechanism: community Special Authority applications, hospital indication/prescriber restrictions and renewal or continuation rules. Boundary: Special Authority approval is not Medsafe consent. HML restrictions and community Special Authority criteria may be related but are not necessarily identical.

Change in the Atlas pathway

Special Authority and HML restrictions

Affected access gates
Special Authority and HML restrictions
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Lifecycle: tender terms depend on the listing and contract

Why Atlas revised this pathway

Pharmac may amend the Schedule on its own initiative or following an application, including access criteria, subsidy, indications, formulations or presentations, pack size, brand and removal from funded listing. Reference pricing may align the subsidy for a therapeutic subgroup with its lowest price. Where the ex-manufacturer price is higher, a patient or supply-chain surcharge may arise. Read each listing decision separately. The Annual Tender creates competition for many off-patent medicines and may award Principal Supply Status. The supplier overview describes up to about 95% of the funded market for about three years, but actual scope, term, transition and alternative-brand allowances depend on the item’s listing and contract. These figures are not a guaranteed purchase volume or sales forecast. Suppliers need not be New Zealand companies to bid, but must hold the necessary New Zealand regulatory consents before an award. Tender savings fund new medicines or expanded access, directly linking mature-market procurement with the innovation funding pool. Supply interruptions, contract expiry, new evidence or population changes may trigger commercial renegotiation, wider or narrower criteria, alternative-brand listings or exceptional supply arrangements.

Change in the Atlas pathway

Lifecycle: tender terms depend on the listing and contract

Affected access gates
Lifecycle: tender terms depend on the listing and contract
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Medsafe: consent is separate from government funding

Why Atlas revised this pathway

An NMA must demonstrate quality, safety and efficacy. Medsafe may request further information before deciding whether to recommend consent to the Minister's delegate. The 2026 target table gives 150 working days for the initial evaluation of a full NMA and 75 days for an abbreviated application, with additional time for company responses to requests for information and Medsafe's further evaluation. These are stage-specific targets, not an end-to-end approval promise. Medsafe explicitly states that it is not responsible for funding or purchasing. The sponsor still decides whether to supply the medicine in New Zealand after approval. Pharmac assessment may run in parallel with Medsafe review to reduce sequential waiting. Legal supply and funding decisions remain separate. From11August2026, specified product or packaging groups can qualify for a non-time-limited general labelling exemption, subject to their minimum label requirements. Controlled drugs and related products are excluded. New labels use the standard NMA/CMN process with the applicable group declaration and case-by-case evaluation; eligibility is not a blanket waiver of labelling, marketing consent or funding requirements. An eligible existing time-limited exemption remains valid until expiry, when the general exemption takes effect; an unchanged eligible approved label needs no new notification. Changes to a label with a general exemption require prior approval through CMN Labelling–G2 even when minor, and are not self-assessable G1 changes. General exemptions need no routine renewal but remain subject to later regulatory changes and do not permit inconsistent patient information. Medsafe’s 16 February 2026 policy clarifies data-sheet disclosure of excipients with known effects: use the EMA Annex and Label Statements Database, state quantities in section 2, and describe the effects in section 4.4 with CMI updates where appropriate. It recommends the lower threshold when the two references differ, and specifies the LSD threshold of 3 ppm or more for gluten-containing ingredients. This does not change package-labelling requirements in the LSD; consult the current references for the actual excipient. The ordinary abbreviated NMA route is distinct from consent by verification. It relies on complete, unredacted English assessment reports for an eligible intermediate- or higher-risk medicine approved by a recognised regulator within the preceding ten years, with the required product consistency; Medsafe still makes an independent decision. Priority assessment may be considered for significant clinical need, significant taxpayer savings, or medicines manufactured in New Zealand for export, subject to the stated criteria and available assessment resources. Ordinary CMNs are not eligible; section24(5) referrals can use the NMA priority criteria. Priority does not itself grant consent or funding. Section23 provisional consent lasts no more than two years and each renewal can be for up to two years. The NMA guide asks sponsors to apply for renewal at least three months before expiry and generally seek full consent within six years; these are guidance expectations, not an automatic renewal or a statutory six-year cap. Keep provisional consent current while full consent is assessed. For material changes, current section24 sets a 64-working-day distribution restriction, subject to the statutory exceptions or prior written Director-General consent, and a 32-working-day window to request further information. A section24(5) referral requires the Ministerial route; expiry of a target alone is not consent. The 2023 CMN guide’s older 45-day wording must not replace the current Act. Use CMN Form A for non-biological medicines and Form B for biological or biotechnological medicines, with the applicable change category and declarations. An eligible stand-alone self-assessable change needs notification and receipt of payment before implementation; bundling it with an assessable change requires consent for the whole application. A new active ingredient, combination, strength, dose form, flavour or trade name may require a separate NMA. Changes to a label with a general exemption use assessable Labelling–G2 rather than self-assessable G1.

Change in the Atlas pathway

Medsafe: consent is separate from government funding

Affected access gates
Medsafe: consent is separate from government funding
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Medsafe: consent is separate from government funding

Why Atlas revised this pathway

An NMA must demonstrate quality, safety and efficacy. Medsafe may request further information before deciding whether to recommend consent to the Minister's delegate. The 2026 target table gives 150 working days for the initial evaluation of a full NMA and 75 days for an abbreviated application, with additional time for company responses to requests for information and Medsafe's further evaluation. These are stage-specific targets, not an end-to-end approval promise. Medsafe explicitly states that it is not responsible for funding or purchasing. The sponsor still decides whether to supply the medicine in New Zealand after approval. Pharmac assessment may run in parallel with Medsafe review to reduce sequential waiting. Legal supply and funding decisions remain separate. From11August2026, specified product or packaging groups can qualify for a non-time-limited general labelling exemption, subject to their minimum label requirements. Controlled drugs and related products are excluded. New labels use the standard NMA/CMN process with the applicable group declaration and case-by-case evaluation; eligibility is not a blanket waiver of labelling, marketing consent or funding requirements. An eligible existing time-limited exemption remains valid until expiry, when the general exemption takes effect; an unchanged eligible approved label needs no new notification. Changes to a label with a general exemption require prior approval through CMN Labelling–G2 even when minor, and are not self-assessable G1 changes. General exemptions need no routine renewal but remain subject to later regulatory changes and do not permit inconsistent patient information. Medsafe’s 16 February 2026 policy clarifies data-sheet disclosure of excipients with known effects: use the EMA Annex and Label Statements Database, state quantities in section 2, and describe the effects in section 4.4 with CMI updates where appropriate. It recommends the lower threshold when the two references differ, and specifies the LSD threshold of 3 ppm or more for gluten-containing ingredients. This does not change package-labelling requirements in the LSD; consult the current references for the actual excipient. The ordinary abbreviated NMA route is distinct from consent by verification. It relies on complete, unredacted English assessment reports for an eligible intermediate- or higher-risk medicine approved by a recognised regulator within the preceding ten years, with the required product consistency; Medsafe still makes an independent decision. Priority assessment may be considered for significant clinical need, significant taxpayer savings, or medicines manufactured in New Zealand for export, subject to the stated criteria and available assessment resources. Ordinary CMNs are not eligible; section24(5) referrals can use the NMA priority criteria. Priority does not itself grant consent or funding. Section23 provisional consent lasts no more than two years and each renewal can be for up to two years. The NMA guide asks sponsors to apply for renewal at least three months before expiry and generally seek full consent within six years; these are guidance expectations, not an automatic renewal or a statutory six-year cap. Keep provisional consent current while full consent is assessed. For material changes, current section24 sets a 64-working-day distribution restriction, subject to the statutory exceptions or prior written Director-General consent, and a 32-working-day window to request further information. A section24(5) referral requires the Ministerial route; expiry of a target alone is not consent. The 2023 CMN guide’s older 45-day wording must not replace the current Act. Use CMN Form A for non-biological medicines and Form B for biological or biotechnological medicines, with the applicable change category and declarations. An eligible stand-alone self-assessable change needs notification and receipt of payment before implementation; bundling it with an assessable change requires consent for the whole application. A new active ingredient, combination, strength, dose form, flavour or trade name may require a separate NMA. Changes to a label with a general exemption use assessable Labelling–G2 rather than self-assessable G1.

Change in the Atlas pathway

Medsafe: consent is separate from government funding

Affected access gates
Medsafe: consent is separate from government funding
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Medsafe: consent is separate from government funding

Why Atlas revised this pathway

An NMA must demonstrate quality, safety and efficacy. Medsafe may request further information before deciding whether to recommend consent to the Minister's delegate. The 2026 target table gives 150 working days for the initial evaluation of a full NMA and 75 days for an abbreviated application, with additional time for company responses to requests for information and Medsafe's further evaluation. These are stage-specific targets, not an end-to-end approval promise. Medsafe explicitly states that it is not responsible for funding or purchasing. The sponsor still decides whether to supply the medicine in New Zealand after approval. Pharmac assessment may run in parallel with Medsafe review to reduce sequential waiting. Legal supply and funding decisions remain separate. From11August2026, specified product or packaging groups can qualify for a non-time-limited general labelling exemption, subject to their minimum label requirements. Controlled drugs and related products are excluded. New labels use the standard NMA/CMN process with the applicable group declaration and case-by-case evaluation; eligibility is not a blanket waiver of labelling, marketing consent or funding requirements. An eligible existing time-limited exemption remains valid until expiry, when the general exemption takes effect; an unchanged eligible approved label needs no new notification. Changes to a label with a general exemption require prior approval through CMN Labelling–G2 even when minor, and are not self-assessable G1 changes. General exemptions need no routine renewal but remain subject to later regulatory changes and do not permit inconsistent patient information. Medsafe’s 16 February 2026 policy clarifies data-sheet disclosure of excipients with known effects: use the EMA Annex and Label Statements Database, state quantities in section 2, and describe the effects in section 4.4 with CMI updates where appropriate. It recommends the lower threshold when the two references differ, and specifies the LSD threshold of 3 ppm or more for gluten-containing ingredients. This does not change package-labelling requirements in the LSD; consult the current references for the actual excipient. The ordinary abbreviated NMA route is distinct from consent by verification. It relies on complete, unredacted English assessment reports for an eligible intermediate- or higher-risk medicine approved by a recognised regulator within the preceding ten years, with the required product consistency; Medsafe still makes an independent decision. Priority assessment may be considered for significant clinical need, significant taxpayer savings, or medicines manufactured in New Zealand for export, subject to the stated criteria and available assessment resources. Ordinary CMNs are not eligible; section24(5) referrals can use the NMA priority criteria. Priority does not itself grant consent or funding. Section23 provisional consent lasts no more than two years and each renewal can be for up to two years. The NMA guide asks sponsors to apply for renewal at least three months before expiry and generally seek full consent within six years; these are guidance expectations, not an automatic renewal or a statutory six-year cap. Keep provisional consent current while full consent is assessed. For material changes, current section24 sets a 64-working-day distribution restriction, subject to the statutory exceptions or prior written Director-General consent, and a 32-working-day window to request further information. A section24(5) referral requires the Ministerial route; expiry of a target alone is not consent. The 2023 CMN guide’s older 45-day wording must not replace the current Act. Use the current form to distinguish assessable CMNs from eligible self-assessable notifications. An eligible stand-alone self-assessable change requires notification and receipt of payment before implementation; combining it with an assessable change requires consent for the whole application first. A new active ingredient, combination, strength, dose form, flavour or trade name can require a separate NMA rather than a CMN. General-exemption label changes retain their specific prior-approval rule.

Change in the Atlas pathway

Medsafe: consent is separate from government funding

Affected access gates
Medsafe: consent is separate from government funding
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Contract expiry concerns funding-listing terms, not marketing authorisation

Why Atlas revised this pathway

listing agreement term; Pharmac/supplier; net price and protection may change; supply/access continuity risk; supply, forecast, price, performance; renew, replace, vary or delist

Change in the Atlas pathway

Contract expiry concerns funding-listing terms, not marketing authorisation

Affected access gates
Contract expiry concerns funding-listing terms, not marketing authorisation
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

The 2026 verification pathway: a reliance route with a separate national decision

Why Atlas revised this pathway

Eligibility requires full marketing authorisations from at least two recognised regulatory authorities and a New Zealand product identical in all material aspects to the overseas products. Conditional, provisional or emergency approvals cannot satisfy the required full authorisations. Medsafe performs minimal verification, but the Minister's delegate still makes an independent national decision. The application may be granted, refused, or withdrawn and resubmitted through the full or abbreviated route. The validation decision is due within 10 working days after the application and validation fee are received, excluding applicable pauses. Evaluation starts when the application fee is paid: initial evaluation/RFI by working day 20 and a decision by working day 30 or earlier. The clock stops while an RFI is answered; the response period is 30 working days. Medsafe issues one RFI round. Minor differences in indication or dosage wording can be acceptable; Medsafe generally starts with the more restrictive wording, and a subset of initially approved indications may be proposed. This differs from adding new/expanded indications or a new/modified dosage regimen as a clinical variation, which cannot be included in a verification application. Generics/biosimilars must match the New Zealand innovator’s indication and dosing. Usual post-approval change procedures still apply. Planning implication: establish the two reference approvals, product sameness, New Zealand Module 1 and variation history in advance. Otherwise the assumed 30-day pathway may not apply.

Change in the Atlas pathway

The 2026 verification pathway: a reliance route with a separate national decision

Affected access gates
The 2026 verification pathway: a reliance route with a separate national decision
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Factors for Consideration: a broader assessment than the ICER

Why Atlas revised this pathway

The four dimensions are Need, Health Benefits, Costs and Savings, and Suitability. They are considered at the individual, family/whānau/society and health-system levels. Need includes disease severity, existing funded alternatives and health disparities affecting Māori, Pacific peoples and others. Health benefits include effects on patients and wider populations; costs and savings cover pharmaceutical and wider health-system consequences; suitability includes practical administration and workforce considerations. Cost-utility analysis helps compare incremental value, but the relevance of the Factors varies with the decision and requires judgement. Pharmac does not use a fixed cost-effectiveness threshold; funding choices aim at the best health outcomes achievable within the available budget. Cross-country distinction: a favourable ICER does not itself secure Pharmac funding. Japan uses cost-effectiveness evaluation to adjust prices for designated products already listed in the NHI; that is a different decision from selecting investments within Pharmac’s budget.

Change in the Atlas pathway

Factors for Consideration: a broader assessment than the ICER

Affected access gates
Factors for Consideration: a broader assessment than the ICER
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Provisional agreement, consultation and final decision

Why Atlas revised this pathway

After a provisional agreement, Pharmac normally consults patients, whānau, Māori, clinicians, suppliers and Health NZ on the proposed population, access criteria, brand and implementation. Its April2026 policy requires formal consultation for first-time funding, proposed Schedule changes, material clinical or commercial impacts and other stated triggers. Consultation submissions may change the proposal. The Board or its delegate makes the final funding decision and Pharmac communicates the outcome under its policy. Only an approved Schedule change leads to the corresponding listing or amendment; a decision does not automatically create a funded listing. Reaching commercial agreement therefore does not yet create a final public commitment.

Change in the Atlas pathway

Provisional agreement, consultation and final decision

Affected access gates
Provisional agreement, consultation and final decision
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Separate national access-criteria decisions from hospital implementation

Why Atlas revised this pathway

new evidence, unmet need, implementation feedback; Pharmac for national funding/access criteria; Health NZ for hospital implementation; may change net expenditure; Pharmac may amend national SA/HML criteria; hospitals apply the HML and any permitted local restrictions; Clinical rationale and relevant evidence or implementation feedback for the proposed change; Retain or amend national Schedule criteria; hospital implementation is a separate step

Change in the Atlas pathway

Separate national access-criteria decisions from hospital implementation

Affected access gates
Separate national access-criteria decisions from hospital implementation
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Funding applications: one medicine may have separate applications for different indications

Why Atlas revised this pathway

A supplier, clinician or another person in New Zealand may apply. Company applications usually include clinical trials and a price offer. Pharmac assesses the evidence and obtains independent clinical advice from PTAC or specialist advisory committees as needed, alongside research and economic analysis. A clinical recommendation helps the assessment but does not determine the final funding decision. Different indications for one molecule can have different application statuses, priority-list positions and access criteria. A single molecule-level funded/not-funded label is insufficient. Published provisional PTAC recommendations can precede the final committee-agreed record. Neither a provisional nor a final clinical recommendation is Pharmac’s confidential cross-portfolio ranking or a commitment to fund.

Change in the Atlas pathway

Funding applications: one medicine may have separate applications for different indications

Affected access gates
Funding applications: one medicine may have separate applications for different indications
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Patient-exception outcomes allow different approval durations

Why Atlas revised this pathway

A patient-specific approval is not necessarily limited to one year or required to renew annually. Current official guidance permits durations from one month to lifetime depending on the treatment and condition; renewal applies when the actual approval requires it.

Change in the Atlas pathway

Patient-exception outcomes allow different approval durations

Affected access gates
Patient-exception outcomes allow different approval durations
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

NPPA: approval duration, urgent assessment and current reform status

Why Atlas revised this pathway

Only authorised prescribers acting within their scope may apply for NPPA; rapid-assessment applications are limited to Health New Zealand clinicians. The individual needs exceptional clinical circumstances and must have exhausted all clinically suitable funded options, including relevant non-drug treatments. Patient preference alone is not a clinical exception. Approval is patient-specific; its duration depends on the treatment and condition and can range from one month to lifetime. For an approval that expires, renewal must address its previous criteria and clinical updates; Pharmac recommends applying one month before expiry. This is recommended lead time, not a statutory deadline or automatic renewal. The clinician notifies the patient; Pharmac also notifies the nominated pharmacy when approved. Rapid NPPA is for clinically urgent Health NZ hospital inpatients. Treatment needed within five working days is a guide to urgency, not a five-day decision guarantee. It cannot be used to accelerate discharge. Pharmac must assess rapid applications for any treatment claimable as a PCT pharmaceutical, including pharmaceutical cancer treatment, rituximab, infliximab and tocilizumab. Hospital rapid assessment is for eligible cases too urgent for a Pharmac decision in the clinically appropriate time and must apply the NPPA principles. Immediate life-threatening emergencies have a separate hospital-protocol route when the unlisted-indication and stock conditions are met, with notification to Pharmac. For long-term community treatment started with an HML medicine that is not community funded, the rapid-assessment guidance directs a 30-day discharge supply under rule3.5 and a standard NPPA community-funding application. Rule3.5 retains its original-pack or hospital discharge-policy exceptions and HML restrictions. The exceptional-circumstances framework retains Pharmac discretion and considers wider population benefits, opportunity costs and the available budget. Declined cases can seek process review or be resubmitted with materially changed clinical circumstances or evidence. A population-listing decline does not automatically end an existing NPPA approval; continued funding remains subject to its renewal conditions. The Exceptional Circumstances Framework is under review. The current timetable expects a second consultation in late November 2026; proposed reform is not an operative funding rule. Continue to use the current pathway and any medicine-specific conditions until a final change is confirmed.

Change in the Atlas pathway

NPPA: approval duration, urgent assessment and current reform status

Affected access gates
NPPA: approval duration, urgent assessment and current reform status
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

NPPA, waivers and medicine-specific alternative-brand pathways

Why Atlas revised this pathway

Purpose: address individual cases that population policy cannot reasonably cover. Mechanism: waivers address the intent of funding criteria, while NPPA addresses exceptional clinical circumstances. Some medicines have a bespoke alternative-brand pathway with its own form and criteria; use that pathway where available. Without one, an NPPA request can be considered under the NPPA principles and Factors for Consideration, without automatic funding. Boundary: this should not be a company's routine launch plan and is not equivalent to compassionate supply.

Change in the Atlas pathway

NPPA, waivers and medicine-specific alternative-brand pathways

Affected access gates
NPPA, waivers and medicine-specific alternative-brand pathways
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Confidential rebates and expenditure management

Why Atlas revised this pathway

Purpose: keep the net price paid by Pharmac confidential, obtain a lower net unit price or manage total expenditure risk. These arrangements do not by themselves guarantee protection of an international list price. Mechanism: all-unit percentage rebates, threshold rebates, discounts and two-part pricing. Boundary: a Schedule subsidy does not represent the net price, and a rebate is not synonymous with an outcomes-based agreement.

Change in the Atlas pathway

Confidential rebates and expenditure management

Affected access gates
Confidential rebates and expenditure management
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Commercial terms: net expenditure, disclosure and supply obligations

Why Atlas revised this pathway

Pharmac generally needs acceptable commercial terms before it can support a funding decision. A listing agreement may specify the agreed price, rebates, access criteria and protection against delisting or subsidy reductions. It may also cover several products from the same supplier. A rebate can reduce the net unit price for all funded units or apply only to expenditure above a threshold. Discounts, two-part pricing and other expenditure-management mechanisms are also possible. The Schedule shows public subsidies and prices, which do not reveal net costs after confidential rebates. Confidentiality is subject to applicable disclosure law and the actual agreement: the published standard template expressly recognises Official Information Act and other legal disclosure obligations. A portfolio agreement may change the apparent acceptable price of an individual product. Comparison pages should identify this as a system-level commercial feature rather than imply a universal net-price formula. The published listing agreement is a template. Product, price, listing date and minimum stock belong in Annex1; negotiated special terms belong in Annex2 and prevail over inconsistent standard terms. It does not prove any particular supplier’s executed price, rebate, term or stock commitment. The standard template also requires supply continuity and applicable regulatory consents. A supply issue must be notified when the supplier becomes aware of it, with a report within two Business Days; alternative supply requires Pharmac’s written consent under the relevant clause. Read these as template contractual conditions, with the actual agreement and special terms controlling, rather than universal statutory deadlines.

Change in the Atlas pathway

Commercial terms: net expenditure, disclosure and supply obligations

Affected access gates
Commercial terms: net expenditure, disclosure and supply obligations
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Special Authority: application route, expiry and dispensing are separate checks

Why Atlas revised this pathway

Pharmac sets specific funding criteria, while Health NZ receives and operates Special Authority applications. Each restricted medicine's Schedule listing links to its own Special Authority form. Criteria can cover indication, severity, previous therapy, specialist recommendation, dose or quantity and renewal. Approval may be time-limited or may not require routine renewal. A Special Authority waiver may suit a patient who misses a technical criterion but meets its intent. The prescriber uses the medicine’s ordinary form with supporting explanation and patient consent, and submits it to Pharmac; a waiver cannot be requested through the Electronic Special Authority system. Previously self-funded, overseas or compassionate treatment may qualify if the initial criteria were met before treatment began. A payable community claim requires the applicable prescription, Special Authority number, specialist or endorsement conditions and an eligible supplier agreement or statutory payment notice. Special Authority approval is not retrospective. If first dispensing precedes approval expiry, repeats completing up to three Months’ supply can remain subsidised after expiry unless the medicine has been delisted. Supply periods and dispensing quantities are separate. First dispensing must occur within three Months of the prescription. The rules allow up to 12 Months’ subsidised treatment where no legal supply limit applies, subject to dispensing rules; that is not permission to dispense a year at once. Where no legal dispensing maximum applies, a single dispensing is generally limited to three Months unless otherwise specified. In these Schedule rules, a capitalised Month means 30 consecutive days. Item-specific frequency, controlled-drug limits, modified dispensing and discharge exceptions still apply; check the actual listing and prescription.

Change in the Atlas pathway

Special Authority: application route, expiry and dispensing are separate checks

Affected access gates
Special Authority: application route, expiry and dispensing are separate checks
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Hospital use: indication, prescriber and local execution checks

Why Atlas revised this pathway

The HML lists medicines that public hospitals may use or must fund under its rules. Some products have prescriber or indication restrictions. Hospitals may set additional local specialist restrictions, but must not unreasonably limit funded access or undermine Pharmac decisions and must notify Pharmac. Pharmac may require a restriction to be changed or removed. Hospital prescriber restrictions can be met through the specified specialist, documented specialist recommendation or an approved hospital protocol. Defined emergency arrangements require reasonable attempts to contact the specialist; treatment beyond 24 hours must satisfy the specialist or protocol route. A current Special Authority approval can satisfy an HML indication restriction, but does not by itself waive a prescriber restriction. Restricted-eligibility (RS) forms are local checklists and must not be submitted to Pharmac or the Ministry of Health. Check the actual hospital’s documentation requirements. An indication waiver is assessed case by case where the intent is met; this differs from satisfying the prescriber restriction. HML listing alone does not establish stock, service capacity or immediate patient supply. Unlisted medicines or uses outside an indication restriction normally require a specific Part8 exception, such as approved NPPA or a defined continuation arrangement; a broad statement of clinical need is insufficient.

Change in the Atlas pathway

Hospital use: indication, prescriber and local execution checks

Affected access gates
Hospital use: indication, prescriber and local execution checks
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

NPPA: ordinary, rapid and emergency routes have different conditions

Why Atlas revised this pathway

Only authorised prescribers acting within their scope may apply for NPPA; rapid-assessment applications are limited to Health New Zealand clinicians. The individual needs exceptional clinical circumstances and must have exhausted all clinically suitable funded options, including relevant non-drug treatments. Patient preference alone is not a clinical exception. Approval is patient-specific and generally time-limited. The clinician notifies the patient; Pharmac also notifies the nominated pharmacy when approved. Renewal must address the previous approval's criteria and clinical updates; Pharmac recommends submitting one month before expiry. That is recommended lead time, not a new universal statutory deadline or automatic continuation. Rapid NPPA is for clinically urgent Health NZ hospital inpatients. Treatment needed within five working days is a guide to urgency, not a five-day decision guarantee. It cannot be used to accelerate discharge. Pharmac must assess rapid applications for any pharmaceutical cancer treatment, rituximab, infliximab or tocilizumab. Other eligible cases may use the hospital’s rapid process where available. Immediate life-threatening emergencies have a separate hospital-protocol route when the unlisted indication and stock conditions are met, with notification to Pharmac. For long-term community treatment started with an HML medicine that is not community funded, the rapid-assessment guidance directs a 30-day discharge supply under rule3.5 and a standard NPPA community-funding application. Rule3.5 retains its original-pack or hospital discharge-policy exceptions and HML restrictions. The exceptional-circumstances framework retains Pharmac discretion and considers wider population benefits, opportunity costs and the available budget. Declined cases can seek process review or be resubmitted with materially changed clinical circumstances or evidence. A population-listing decline does not automatically end an existing NPPA approval; continued funding remains subject to its renewal conditions.

Change in the Atlas pathway

NPPA: ordinary, rapid and emergency routes have different conditions

Affected access gates
NPPA: ordinary, rapid and emergency routes have different conditions
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Lifecycle: tender terms depend on the listing and contract

Why Atlas revised this pathway

Pharmac may amend the Schedule on its own initiative or following an application, including access criteria, subsidy, indication or presentation, pack, brand and delisting. Reference pricing may align the subsidy for a therapeutic subgroup with its lowest price. Where the ex-manufacturer price is higher, a patient or supply-chain surcharge may arise. Read each listing decision separately. The Annual Tender creates competition for many off-patent medicines and may award Principal Supply Status. The supplier overview describes up to about 95% of the funded market for about three years, but actual scope, term, transition and alternative-brand allowances depend on the item’s listing and contract. These figures are not a guaranteed purchase volume or sales forecast. Tender savings fund new medicines or expanded access, directly linking mature-market procurement with the innovation funding pool. Supply interruptions, contract expiry, new evidence or population changes may trigger commercial renegotiation, wider or narrower criteria, alternative-brand listings or exceptional supply arrangements.

Change in the Atlas pathway

Lifecycle: tender terms depend on the listing and contract

Affected access gates
Lifecycle: tender terms depend on the listing and contract
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Principal Supply Status: contractual scope and exceptions

Why Atlas revised this pathway

Purpose: obtain lower prices and supply commitments through off-patent competition and release funding. Mechanism: competitive tender or RFP, a specified supply-status term and brand transition. Hospital DV limits, alternative-brand allowances and exceptions follow the actual Schedule listing and national contract; non-supply and Pharmac-approved exceptions can permit alternative brands. Do not turn the overview’s approximately 95% share into a universal volume guarantee. Boundary: Pharmac may retain alternative brands and individual exceptions. This is not an absolute legal monopoly.

Change in the Atlas pathway

Principal Supply Status: contractual scope and exceptions

Affected access gates
Principal Supply Status: contractual scope and exceptions
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Patient exceptions retain decision and funding boundaries

Why Atlas revised this pathway

Prescribers apply and supply the clinical evidence; they do not thereby grant NPPA funding. Pharmac or the applicable eligible hospital rapid route decides under the relevant framework. The decision is patient-specific but has wider budget effects and does not establish a population listing.

Change in the Atlas pathway

Patient exceptions retain decision and funding boundaries

Affected access gates
Patient exceptions retain decision and funding boundaries
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-23

Tender market share is subject to actual contract terms

Why Atlas revised this pathway

The tender overview is a general explanation. PSS access depends on the actual listing and contract, including alternative-brand allowances and exceptions; an approximate market share does not guarantee purchases.

Change in the Atlas pathway

Tender market share is subject to actual contract terms

Affected access gates
Tender market share is subject to actual contract terms
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-02-16Atlas content updated2026-10-22

Medsafe: consent is separate from government funding

Why Atlas revised this pathway

An NMA must demonstrate quality, safety and efficacy. Medsafe may request further information before deciding whether to recommend consent to the Minister's delegate. The 2026 target table gives 150 working days for the initial evaluation of a full NMA and 75 days for an abbreviated application, with additional time for company responses to requests for information and Medsafe's further evaluation. These are stage-specific targets, not an end-to-end approval promise. Medsafe explicitly states that it is not responsible for funding or purchasing. The sponsor still decides whether to supply the medicine in New Zealand after approval. Pharmac assessment may run in parallel with Medsafe review to reduce sequential waiting. Legal supply and funding decisions remain separate. From11August2026, specified product or packaging groups can qualify for a non-time-limited general labelling exemption, subject to their minimum label requirements. Controlled drugs and related products are excluded. New labels use the standard NMA/CMN process with the applicable group declaration and case-by-case evaluation; eligibility is not a blanket waiver of labelling, marketing consent or funding requirements. An eligible existing time-limited exemption remains valid until expiry, when the general exemption takes effect; an unchanged eligible approved label needs no new notification. Changes to a label with a general exemption require prior approval through CMN Labelling–G2 even when minor, and are not self-assessable G1 changes. General exemptions need no routine renewal but remain subject to later regulatory changes and do not permit inconsistent patient information. Medsafe’s 16 February 2026 policy clarifies data-sheet disclosure of excipients with known effects: use the EMA Annex and Label Statements Database, state quantities in section 2, and describe the effects in section 4.4 with CMI updates where appropriate. It recommends the lower threshold when the two references differ, and specifies the LSD threshold of 3 ppm or more for gluten-containing ingredients. This does not change package-labelling requirements in the LSD; consult the current references for the actual excipient.

Change in the Atlas pathway

Medsafe: consent is separate from government funding

Affected access gates
Medsafe: consent is separate from government funding
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-22

New indications: separate consent from funded access

Why Atlas revised this pathway

New indication or expanded access Proposed new indication or change to funding criteria Medsafe for consent and changes; Pharmac for funding Funding price or subsidy terms require a separate Pharmac decision or agreement Regulatory approval does not automatically expand funded eligibility Evidence for the regulatory change; separate clinical and economic information for any funding proposal Regulatory and funding decisions can differ

Change in the Atlas pathway

New indications: separate consent from funded access

Affected access gates
New indications: separate consent from funded access
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-22

The 2026 verification pathway: a reliance route with a separate national decision

Why Atlas revised this pathway

Eligibility requires full marketing authorisations from at least two recognised regulatory authorities and a New Zealand product identical in all material aspects to the overseas products. Conditional, provisional or emergency approvals cannot satisfy the required full authorisations. Medsafe performs minimal verification, but the Minister's delegate still makes an independent national decision. The application may be granted, refused, or withdrawn and resubmitted through the full or abbreviated route. The validation decision is due within 10 working days after the application and validation fee are received, excluding applicable pauses. Evaluation starts when the application fee is paid: initial evaluation/RFI by working day 20 and a decision by working day 30 or earlier. The clock stops while an RFI is answered; the response period is 30 working days. Medsafe issues one RFI round. Minor differences in indication or dosage wording can be acceptable; Medsafe generally starts with the more restrictive wording, and a subset of initially approved indications may be proposed. This differs from adding new/expanded indications or a new/modified dosage regimen as a clinical variation, which cannot be included in a verification application. Generics/biosimilars must match the New Zealand innovator’s indication and dosing. Usual post-approval change procedures still apply. Planning implication: establish the two reference approvals, product sameness, New Zealand Module 1 and variation history in advance. Otherwise the assumed 30-day pathway may not apply.

Change in the Atlas pathway

The 2026 verification pathway: a reliance route with a separate national decision

Affected access gates
The 2026 verification pathway: a reliance route with a separate national decision
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-22

Verification pathway

Why Atlas revised this pathway

Purpose: accelerate local consent for an NMA fully approved by two recognised regulators where the products are materially the same. Mechanism: reliance-based verification, New Zealand-specific compliance and an independent national decision. Boundary: consent is not automatic. Material product differences and ineligible authorisations can exclude an application. Minor indication/dosage wording differences and a subset of initially approved indications may be acceptable; new/extended indications or new/modified dosage regimens submitted as clinical variations are excluded.

Change in the Atlas pathway

Verification pathway

Affected access gates
Verification pathway
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-22

Named Patient Pharmaceutical Assessment (NPPA) and unapproved medicines

Why Atlas revised this pathway

NPPA addresses exceptional clinical circumstances for an individual. It supplements the population-level Schedule process and assesses each case using the Factors for Consideration. A Schedule criteria waiver differs from NPPA: a waiver follows the intent of existing criteria; NPPA can address a patient's need that the current Schedule cannot meet. Section 29 allows supply for a known patient on the request of a medical practitioner, nurse practitioner or pharmacist prescriber caring for that patient. Section 29A covers an unapproved medicine listed in the Pharmaceutical Schedule as an alternative to an approved medicine in short supply; any authorised prescriber may request it for a patient in their care. For section 29/29A supply, the importer or manufacturer retains patient, prescriber and place-of-supply records, which Medsafe may request. As soon as practicable after each supply month, it reports medicine names, dose form, strength, pack size, supply month/year and quantity under section 29B. Patient names are not part of that routine subset. Prescribers must explain unapproved use and obtain informed consent. Boundary: section 29 is a legal supply exception and does not automatically provide Pharmac funding. NPPA is a funding exception and does not automatically waive regulatory or supply obligations. Section 25 separately permits an authorised prescriber to procure medicine for a known, identifiable patient within their scope of practice. Medsafe distinguishes this from section 29/29A supply: use of an approved medicine for an unapproved purpose does not itself require a report to Medsafe. The applicable consent and other supply obligations remain.

Change in the Atlas pathway

Named Patient Pharmaceutical Assessment (NPPA) and unapproved medicines

Affected access gates
Named Patient Pharmaceutical Assessment (NPPA) and unapproved medicines
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-08-11Atlas content updated2026-10-18

Medsafe: consent is separate from government funding

Why Atlas revised this pathway

An NMA must demonstrate quality, safety and efficacy. Medsafe may request further information before deciding whether to recommend consent to the Minister's delegate. The 2026 target table gives 150 working days for the initial evaluation of a full NMA and 75 days for an abbreviated application, with additional time for company responses to requests for information and Medsafe's further evaluation. These are stage-specific targets, not an end-to-end approval promise. Medsafe explicitly states that it is not responsible for funding or purchasing. The sponsor still decides whether to supply the medicine in New Zealand after approval. Pharmac assessment may run in parallel with Medsafe review to reduce sequential waiting. Legal supply and funding decisions remain separate. From11August2026, specified product or packaging groups can qualify for a non-time-limited general labelling exemption, subject to their minimum label requirements. Controlled drugs and related products are excluded. New labels use the standard NMA/CMN process with the applicable group declaration and case-by-case evaluation; eligibility is not a blanket waiver of labelling, marketing consent or funding requirements. An eligible existing time-limited exemption remains valid until expiry, when the general exemption takes effect; an unchanged eligible approved label needs no new notification. Changes to a label with a general exemption require prior approval through CMN Labelling–G2 even when minor, and are not self-assessable G1 changes. General exemptions need no routine renewal but remain subject to later regulatory changes and do not permit inconsistent patient information.

Change in the Atlas pathway

Medsafe: consent is separate from government funding

Affected access gates
Medsafe: consent is separate from government funding
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official sourceDate not specifiedAtlas content updated2026-10-17

Preserve NPPA applicant, alternative-treatment and renewal conditions

Why Atlas revised this pathway

Only authorised prescribers acting within their scope may apply for NPPA; rapid-assessment applications are limited to Health New Zealand clinicians. The individual needs exceptional clinical circumstances and must have exhausted all clinically suitable funded options, including relevant non-drug treatments. Patient preference alone is not a clinical exception. Approval is patient-specific and generally time-limited. The clinician notifies the patient; Pharmac also notifies the nominated pharmacy when approved. Renewal must address the previous approval's criteria and clinical updates; Pharmac recommends submitting one month before expiry. That is recommended lead time, not a new universal statutory deadline or automatic continuation.

Change in the Atlas pathway

Preserve NPPA applicant, alternative-treatment and renewal conditions

Affected access gates
Preserve NPPA applicant, alternative-treatment and renewal conditions
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-10-08Atlas content updated2026-10-17

Separate the practice tender from a real bid

Why Atlas revised this pathway

The8 October2026 notice opens the annual-tender portal for practice until26 October2026 at16:00 New Zealand time. It uses2025/26 medicines for the exercise, and submitted practice bids are not actual bids. New suppliers need company registration for the e-portal; previous participants from2016/17 onwards may use their existing account. The notice expects the final2026/27 ITT in early November2026. Check its actual release and final terms before treating a practice submission or draft product list as a funding or supply commitment.

Change in the Atlas pathway

Separate the practice tender from a real bid

Affected access gates
Separate the practice tender from a real bid
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-07Atlas content updated2026-10-17

Check full-approval eligibility and fee-based verification clocks

Why Atlas revised this pathway

Both recognised-authority initial full marketing authorisations must fall within four years before submission. Reliance-only approvals, including TGA COR, MHRA IRP and HSA abridged/verification, do not qualify as full evaluation. Joint work-sharing can qualify only with the required complete assessment-report sets. An initially provisional approval cannot be used merely because it later became full. The pathway also excludes cases requiring independent New Zealand benefit-risk assessment, including specified blood-derived, exclusively paediatric/pregnancy, gene-therapy and personalised products. The list is not exhaustive; seek advice for the precise product and risk-management requirements. Validation starts on payment of the validation fee and allows ten working days excluding missing-information stops. Evaluation Day0 is application-fee receipt; the Day20 RFI,30-day response and Day30 decision framework uses working days in New Zealand time, with the response clock stop. Acceptance and fees do not guarantee consent or Pharmac funding.

Change in the Atlas pathway

Check full-approval eligibility and fee-based verification clocks

Affected access gates
Check full-approval eligibility and fee-based verification clocks
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-07-06Atlas content updated2026-10-17

Treat the TAP ranking target separately from funding approval

Why Atlas revised this pathway

Pharmac's TAP page describes a four-year improvement programme, with first-year aims to reduce old applications, update acceptance/triage, and introduce an18-month timeframe target for ranking. This is a programme target for ranking, not a promise to fund every application within18 months. Budget, supplier agreement and the applicable decision process remain separate. The programme also aims to review the Exceptional Circumstances Framework; that stated review does not itself replace current NPPA criteria or create an automatic funding route.

Change in the Atlas pathway

Treat the TAP ranking target separately from funding approval

Affected access gates
Treat the TAP ranking target separately from funding approval
Atlas updated
New Zealand
Pathway changeAtlas research revision
Latest cited official source2026-07-30Atlas content updated2026-10-17

Separate the ACP decision from draft tender terms

Why Atlas revised this pathway

The2026/27 draft-tender notice records a decision to remove Alternative Commercial Proposals from2026/27 and future annual ITTs. The consultation closed10 September2026; it is not a currently open final tender. Other product lists and proposed special terms remain draft until the final ITT. Existing principal-supply price protections, brand-change consultation, eligibility and listing dates require the actual item/contract. Indicative historical usage is not a guarantee of sales or awarded volume.

Change in the Atlas pathway

Separate the ACP decision from draft tender terms

Affected access gates
Separate the ACP decision from draft tender terms